Beaufort, South Carolina
This project includes the design through construction of a multi-story Type I operational aircraft maintenance facility for sixteen F-35(B) and/or F-35(C) aircraft. The facility shall include a 55,000 SF aircraft maintenance hangar bay designed to accommodate six F-35(B) aircraft, an access apron designed to accommodate twelve parked F-35(C) aircraft, shops and maintenance administration, squadron administration and operations, including data network areas, pilot brief and debrief rooms, and supporting utilities.
The project also includes the design through construction of a 95,000 SF multi-story parking garage. Site improvements include rerouting of existing utilities, utility connections, POV parking, site lighting, security fencing with associated turnstiles and gates, sidewalks, landscaping, and ATFP features. The existing aircraft concrete parking ramp will be re-striped and modified to support the F-35(C) operation.
